|
EFKON has a Joint Venture with United Engineers Malaysia and holds a minority share in Irat (Infrared Advanced Technologies), market share is 100%.
All DSRC Microwave Systems from Kapsch, QFree and Mitsubishi have been replaced by EFKON`s sophisticated Electronic Toll Collection Technology!
19 concessionaires Highway total: 1,658km 120 Toll Plazas 3 mio. Touch & Go Users >500 Touch & Go Lanes >200 Free Flow Smarttag Lanes 600.000 Active Infrared On Board Units with contactless Smart Card.
- North-South Expressway
- Kuala Lumpur - Karak Expressway
- Penang Bridge
- Shah Alam Expressway
- Kulim-Butterworth Expressway
- North-South Expressway Central Link
- Seremban-Port Dickson Expressway
- Malaysia_Singapura Second Crossing Expressway
- Sungai Besi Expressway
- Cheras-Kajang Expressway
- Damansara-Puchong Expressway
- Ampang Elevated Highway
- Western KL Traffic Dispensal Schame (SPRINT)
- New Pantai Highway
- Kajang Traffic Dispersal Ring Road
- East Coast Highway
- Guthrie Corridor Expressway (GCE)
- Metramac
- New North Klang Straits Bypass (SHAHPADU)
|